Full Kitchen Remodeling

One coordinated project, from the first sketch to the last cabinet pull. Complete gut-and-rebuild renovations, from demolition to the final walkthrough.

Overview

About full kitchen remodeling

A full kitchen remodel replaces nearly everything: cabinets, countertops, flooring, lighting, sink, backsplash and often the appliances. It is the right choice when the layout no longer works, the finishes are worn out, or you want the kitchen to feel like a different room.

Because so many trades touch the same small space, sequencing is what separates a smooth project from a stressful one. Demolition, rough plumbing and electrical, inspections, cabinets, counters, tile and final fixtures all have to happen in the right order, and a clear plan keeps the timeline predictable.

What's included

  • Design and layout planning
  • Demolition and haul-away
  • Plumbing, gas and electrical updates
  • New cabinets and hardware
  • Countertops, backsplash and flooring
  • Lighting, fixtures and appliance hookups
Options

Choices to consider

Same-layout remodel

Keeps the sink, range and refrigerator where they are, which controls plumbing and electrical costs while still giving you an entirely new look.

New-layout remodel

Moves appliances or adds an island to improve workflow. It costs more because plumbing, gas and wiring have to be rerouted, but it can change how the kitchen works every day.

Phased remodel

Splits the work into stages, such as infrastructure first and finishes later, for homeowners who want to spread out spending.

What affects the price

Cost drivers

  • Kitchen size and how many cabinets it needs
  • Whether the layout changes
  • Cabinet quality: stock, semi-custom or custom
  • Countertop material and appliance package

Timeline

Most full remodels take several weeks of on-site work after design decisions and material lead times are settled. Ordering cabinets and stone early is the best way to protect the schedule.

Before you start

  • Plan a temporary kitchen setup for the weeks the space is out of service.
  • Order long-lead items such as custom cabinets and special appliances before demolition starts.
  • Confirm which permits are needed for electrical, plumbing, gas or structural changes.
Design gallery

Kitchen styles for inspiration

Questions

Full Kitchen Remodeling: common questions

How long does a full kitchen remodel take?

Once materials are ordered, on-site work commonly runs several weeks, depending on size and scope. Design, selections and lead times add planning time before demolition begins.

Can I live in my home during the remodel?

Yes, most homeowners do. Expect dust, noise and no working kitchen for a stretch, so set up a temporary kitchen area with a microwave, small fridge and a sink elsewhere in the home.

What should I decide before I call?

A rough budget, your must-haves, and whether you want to keep or change the layout. Photos of kitchens you like are useful for talking through style.

Talk to us about full kitchen remodeling

Call to talk through your project, your budget and your timeline with a kitchen specialist.

Call (833) 838-1905
Call (833) 838-1905